EPAP II Sub-Projects, May 2008

Reference Number

Company Name/place

Name of sub project

Pipe line projects

01/07

National Cement Co./Helwan

Rehabilitation of electrostatic precipitators for both kilns and cement mills for wet processes for lines I and II.

02/07

Supply of one Mobile Suction Unit and one Auto Cleaning Unit for cement dust

03/07

Tora Cement Co./Helwan

Electrostatic Precipitators Replacement of Kiln n.8 and By-pass & Gravel Bed Filters Replacement for Tourah plant

04/07

Abu zaabal for fertilizers/ Qalubia

Rehabilitation of Phosphoric acid plant

05/07

Installation of a cooling tower

06/07

Revamping of lopulco mills

07/07

Replacement of existing phosphate belt weigher

08/07

Rehabilitation of sulphuric acid plant

09/07

Replacement  of the single super phosphate plant line 1&2

11/07

Installation of two rock phosphate Grinding mills & dust extraction

10/08

Installation of new heat exchanger for phosphoric acid plant

11/08

Installation of new pumps for phosphoric acid plant

13/07

Egyptian starch & glucose/Qalubia

Replacement of the glucose production line

18/07

Wael tex/ Alexandria

Replacing the old open type dyeing system (haspel machines)

19/07

Supply, install, commissioning of  heat setting finishing machine (Ram)

20/07

Supply, install, commissioning of  printing line

23/07

Egyptian starch & glucose/Tora Plant-Cairo

Fuel switching from mazot to natural gas for the boiler

01/08

Egyptian sugar & integrated Industries company/Cairo- Giza

Rehabilitation & modification of Vinasse concentrator

02/08

Replacement of fire tube boiler with water tube boiler using natural gas fuel

03/08

Full automatic tube filling cream & sealing machine

09/08

Misr for chemical industry/Alex

Replacement of the old boiler with new one & Fuel switching from mazzot to natural gas

08/08

The general company for paper industry (Rakta) /Alex

Rehabilitation of the boiler & Fuel switching from mazzot to natural gas

06/08

Middle east for Paper Manufacturing (SIMO)/ Qalubia

Fuel switching oil from mazot to natural gas for the boiler

15/07

Delta for steel / Qalubia

Fuel switching from mazzot to natural gas of the pre heating furnace

New Comers projects

16/07

Alnasr for coke/ Helwan

Supplying & installation of  electricity generator

17/07

Supplying & installation of 400 oven doors

21/07

Cairo for oil and soap/ Ghamra -Cairo

Fuel switching from mazot to natural gas of the boilers

22/07

Amria for cement/ Alexandria

Replacement the gravel filter with EP filter or bag filter line 1

27/07

Revamping of line 2 and upgrading of EP filters

28/07

Upgrading of the de dusting filters line 1&2

04/08

Amria petroleum refining co./ Alex

Rehabilitation of extracted unit to use NMP solvent instead of Phenol

07/08

Town gas Company (Arab Abu Saad & Elsaaf brick factories

Fuel switching for 311 brick factories from mazzot to natural gas

05/08

National Paper company/Alex

Supplying the second stage of the waste water treatment (end  of pipe)

12/08

Akhbar El Youm/ 6th of October

Supplying & Installation of waste Paper pulping unit

13/08

Giza spinning & weaving Co./Giza

Supply & install  & commissioning new dying machines

14/08

Alexandria Portland cement CO./ Alex

Establishment a new clinker storage of 60,000 tons

15/08

Cladding for the belt conveyor

16/08

Isma Dye Co./ kafr eldawar/Alex

Recovery of hydrochloric acid with a new one

17/08

Elnasr for rubber products(Narobin)/ Mostorod /qalyobia

Exchange the old Autoclave machine with new one

18/08

Giza elahlya for drying/ Giza

Fuel switching oil from mazot to natural gas for boilers

19/08

Egyptian Iron & Steal

Supply & install of WWTP

20/08

Acid recycle unit

21/08

De-Dusting system for blast furnace no. 3&4