EPAP II Sub-Projects, May 2008
|
Reference Number |
Company Name/place |
Name of sub project |
|
Pipe line projects |
||
|
01/07 |
National
Cement Co./Helwan |
Rehabilitation
of electrostatic precipitators for both kilns and cement mills for wet
processes for lines I and II. |
|
02/07 |
Supply
of one Mobile Suction Unit and one Auto Cleaning Unit for cement dust |
|
|
03/07 |
Tora
Cement Co./Helwan |
Electrostatic
Precipitators Replacement of Kiln n.8 and By-pass & Gravel Bed Filters Replacement
for Tourah plant |
|
04/07 |
Abu zaabal for fertilizers/ Qalubia |
Rehabilitation
of Phosphoric acid plant |
|
05/07 |
Installation
of a cooling tower |
|
|
06/07 |
Revamping
of lopulco mills |
|
|
07/07 |
Replacement
of existing phosphate belt weigher |
|
|
08/07 |
Rehabilitation
of sulphuric acid plant |
|
|
09/07 |
Replacement of the single super phosphate plant line
1&2 |
|
|
11/07 |
Installation
of two rock phosphate Grinding mills & dust extraction |
|
|
10/08 |
Installation
of new heat exchanger for phosphoric acid plant |
|
|
11/08 |
Installation
of new pumps for phosphoric acid plant |
|
|
13/07 |
Egyptian starch & glucose/Qalubia |
Replacement of the glucose production line |
|
18/07 |
Wael
tex/ Alexandria |
Replacing
the old open type dyeing system (haspel machines) |
|
19/07 |
Supply,
install, commissioning of heat setting
finishing machine (Ram) |
|
|
20/07 |
Supply,
install, commissioning of printing
line |
|
|
23/07 |
Egyptian starch & glucose/Tora
Plant-Cairo |
Fuel switching from mazot to natural gas for the
boiler |
|
01/08 |
Egyptian sugar & integrated Industries
company/Cairo- Giza |
Rehabilitation & modification of Vinasse
concentrator |
|
02/08 |
Replacement of fire tube boiler with water tube
boiler using natural gas fuel |
|
|
03/08 |
Full automatic tube filling cream & sealing
machine |
|
|
09/08 |
Misr for chemical industry/Alex |
Replacement of the old boiler with new one & Fuel
switching from mazzot to natural gas |
|
08/08 |
The general company for paper industry (Rakta) /Alex |
Rehabilitation of the boiler & Fuel switching
from mazzot to natural gas |
|
06/08 |
Middle east for Paper Manufacturing (SIMO)/ Qalubia |
Fuel switching oil from mazot to natural gas for the
boiler |
|
15/07 |
Delta for steel / Qalubia |
Fuel
switching from mazzot to natural gas of the pre heating furnace |
|
New Comers projects |
||
|
16/07 |
Alnasr for coke/ Helwan |
Supplying
& installation of electricity
generator |
|
17/07 |
Supplying
& installation of 400 oven doors |
|
|
21/07 |
Cairo for oil and soap/ Ghamra -Cairo |
Fuel switching from mazot to natural gas
of the boilers |
|
22/07 |
Amria for cement/ Alexandria |
Replacement the gravel filter with EP filter or bag
filter line 1 |
|
27/07 |
Revamping of line 2 and upgrading of EP filters |
|
|
28/07 |
Upgrading of the de dusting filters line 1&2 |
|
|
04/08 |
Amria petroleum refining co./ Alex |
Rehabilitation of extracted unit to use NMP solvent
instead of Phenol |
|
07/08 |
Town gas Company (Arab Abu Saad & Elsaaf brick
factories |
Fuel switching for 311 brick factories from mazzot
to natural gas |
|
05/08 |
National Paper company/Alex |
Supplying the second stage of the waste water
treatment (end of pipe) |
|
12/08 |
Akhbar El Youm/ 6th of October |
Supplying & Installation of waste Paper pulping
unit |
|
13/08 |
Giza spinning & weaving Co./Giza |
Supply & install
& commissioning new dying machines |
|
14/08 |
Alexandria Portland cement CO./ Alex |
Establishment a new clinker storage of 60,000 tons |
|
15/08 |
Cladding for the belt conveyor |
|
|
16/08 |
Isma Dye Co./ kafr eldawar/Alex |
Recovery of hydrochloric acid with a new one |
|
17/08 |
Elnasr for rubber products(Narobin)/ Mostorod
/qalyobia |
Exchange the old Autoclave machine with new one |
|
18/08 |
Giza elahlya for drying/ Giza |
Fuel switching oil from mazot to natural gas for
boilers |
|
19/08 |
Egyptian Iron & Steal |
Supply & install of WWTP |
|
20/08 |
Acid recycle unit |
|
|
21/08 |
De-Dusting system for blast furnace no. 3&4 |
|